Project - Prometheus Power, MacMaster University

 |
Project |
| |
Promethmus Power, 3 Mobile Tempest Gas Turbine units. |
| |
|
 |
Customer |
| |
Alstom Power Inc, USA. |
| |
|
 |
Scope |
| |
Design and manufacture of the following :
3 x Mobile Gas Turbine Acoustic Enclosures.
3 x Mobile generator Acoustic Enclosures.
3 x Containerised Gas Turbine Combustion Exhaust systems and Stacks.
|
| |
|
 |
Acoustic performance |
| |
To achieve a residual noise level of 85 dB(A) as a mean level, when measured at 1m from the package perimeter and at 1.5m above grade with one set running. |
| |
|
|