Penguins Redevelopment – Exhaust System

Penguins Redevelopment – Exhaust System

Cullum designed an ATEX-compliant, cold-case exhaust and silencer system for Solar Turbines' Titan 130 compressor set on Shell's Penguins FPSO in the North Sea.
University of Oxford – Oxford Turbine Test Facility (OTRF)

University of Oxford – Oxford Turbine Test Facility (OTRF)

Cullum designed and installed a removable exhaust silencer system for Oxford University's upgraded Turbine Test Facility, letting it switch between rig configurations.
National Grid, Aylesbury Compressor Station – Emissions reduction

National Grid, Aylesbury Compressor Station – Emissions reduction

Cullum fitted CO oxidation catalyst technology to National Grid's rare Avon DLE units at Aylesbury, cutting CO emissions by over 95%.
Mossmorran Exhaust System – Fife Ethylene Plant ExxonMobil

Mossmorran Exhaust System – Fife Ethylene Plant ExxonMobil

Cullum redesigned and installed a new exhaust and water-cooling system for a Gas Turbine package upgrade at ExxonMobil's Fife Ethylene Plant, Mossmorran.
TATA Chemicals Europe – Carbon Capture

TATA Chemicals Europe – Carbon Capture

Cullum designed and installed 150m of stainless steel ducting for Tata Chemicals Europe's Carbon Capture and Utilisation plant, cutting 40,000 tonnes of CO2 a year.
Development of an Innovative Acoustic Factory Acceptance Test for a Gas Turbine Enclosure

Development of an Innovative Acoustic Factory Acceptance Test for…

Cullum developed an innovative acoustic camera testing method to verify a Gas Turbine enclosure was free of noise leaks before dispatch, identifying and fixing sealing issues.
Acoustic Treatment for an Air Breathing Rocket Test Facility

Acoustic Treatment for an Air Breathing Rocket Test Facility

Cullum designed a removable Detuner system to cut noise from air-breathing rocket testing by around 30dB(A), protecting nearby residents while enabling programme growth.